Bid Win Rate and Cost per Won Project Calculator
Use this bid win rate calculator: enter your bids, wins, contract values and estimating effort to see your win rate and what each won job cost to win.
Key takeaways
- Win rate alone hides the cost of losing; cost per won project shows what bidding really costs.
- Measure win rate by client, main contractor and project type, not just overall.
- A bid/no-bid filter is the fastest way to improve both numbers.

Measure your bid win rate
Works in any currency. Nothing you type leaves your browser.
Estimates only, for planning. Use your own data and check figures with a qualified adviser where money or regulation is involved.
What the bid win rate calculator shows
This bid win rate calculator turns the numbers most contractors already have into five outputs: win rate, total value of work won, total cost of bidding, bid cost per won project and gross profit after bid costs. Your construction bid hit rate is useful on its own, but it becomes far more useful when you see what the losing bids cost.
For the strategy side, read our guide on how to win more construction bids. This is one of our free growth tools.
Inputs and formulas
| Output | Formula |
|---|---|
| Win rate | Bids won / bids submitted |
| Won contract value | Bids won x average contract value of won bids |
| Total bid cost | Bids submitted x (estimating hours per bid x hourly cost + other costs per bid) |
| Bid cost per won project | Total bid cost / bids won |
| Gross profit after bid costs | Won contract value x gross margin, minus total bid cost |
“Other costs per bid” covers site visits, printing, bonds or guarantees where required, consultant input and subscription costs for bid platforms, spread across the bids you submit. Use loaded hourly cost for estimating time: salary plus overheads, not just wages.
What does this look like in practice (hypothetical example)?
For illustration, take a fit-out contractor with round, made-up numbers in any currency:
- 40 bids submitted, 8 won
- Average won contract value: 250,000
- 30 estimating hours per bid at 50 per hour
- 500 other costs per bid
- Gross margin on won work: 15 per cent
The results for this hypothetical example: a win rate of 1 in 5 (20%), won value of 2,000,000, total bid cost of 80,000, bid cost per won project of 10,000, and gross profit after bid costs of 220,000 instead of 300,000. More than a quarter of the gross profit on won work went on bidding.
Now suppose a bid/no-bid filter cut the 15 weakest invitations, and the firm still won 7 of the remaining 25. In this example, bid cost falls to 50,000, cost per won project to about 7,100, and the estimating team gains hundreds of hours for better submissions on winnable work.
Measure win rate by segment, not just overall
One overall number hides where you actually win. Track every bid in your CRM with fields for client or main contractor, project type, value band, procurement route and estimator, then calculate win rate for each.
| Segment | What it reveals |
|---|---|
| By client or main contractor | Who values you, and who only uses you as a price check |
| By project type | Where your track record actually persuades evaluators |
| By value band | Whether you are reaching above your proven size |
| By procurement route | Open tenders vs invited, framework or negotiated work |
| By estimator | Coaching needs and workload balance |
Count a bid as decided only when the award is known. Keep “no decision” or “project cancelled” separate so they do not distort the rate.
Bid/no-bid discipline
The quickest way to improve your numbers is to stop pricing work you were unlikely to win. Before estimating starts, score each invitation on relationship, fit, competition, capacity, risk and strategic value. Decline politely and early when the score is low, and say you would like to be considered next time. Our bid/no-bid checklist gives a ready scoring sheet.
- Run the calculator quarterly with your real numbers.
- Run it again for your top two and bottom two segments.
- Move estimating time from the bottom segments to the top ones.
Frequently asked questions
What is a good construction bid hit rate?
There is no reliable single benchmark; it varies by sector, region and procurement route. Compare your own rate over time and between segments, and focus on cost per won project and margin.
Should lost bids for cancelled projects count?
Track them separately. They cost estimating time, so include them in total bid cost, but keep them out of the win rate so it reflects competitive outcomes.
Where do I get these numbers?
From your bid register or CRM pipeline. If you do not yet log every invitation with its outcome and estimating hours, start now; a quarter of data is enough to see patterns.
Sources & method
Figures are shown with their source and year. Numbers labelled as examples are illustrative, not benchmarks or promises. Platform rules and regulations change; check the official source before acting. Nothing here is legal or financial advice. Product statements reflect RealEstateCRM.pk as of October 2026; see the platform overview for feature status.